Update: West Heintz Street Project

W Heintz St Project Location

On Monday, July 13th 2015, the City of Molalla and Westech Construction began work on a street redesign for West Heintz Street between Ridings Ave and Kennel Street. This project includes a new, paved street connecting Ridings and Kennel, a new 10" waterline, and improved stormwater and drainage features. The City anticipates intermittent traffic restrictions on Heintz Street west of Kennel Street and east of Ridings Street for the remaining duration fo the project. The existing, unimproved footpath along Heintz will be closed to pedestrian traffic for public safety.

This project is on schedule to be completed by early November, 2015.

Return to Projects page

 

Return to Public Works

 

Click any thumbnail image to view a slideshow

Second Lift of Asphalt on W. Heintz St.
Second Lift of Asphalt on W. Heintz St.
Finishing Touches - Pouring Asphalt on W. Heintz St.
New Sidewalk on East Side of the Project
New Sidewald Headed West
Improved drainage and storm facilities
Installing a new waterline
A now abandoned valve cluster from the old waterline
Excavation on Heintz near Ridings